Hydroelectrical Power Plant Millares II
C.H. Millares II is a 68MW hydro power project. It is located on Jucar river/basin in Valencian Community, Spain. The project is currently active. It has been developed in single phase. The project construction commenced in 1998 and subsequently entered into commercial operation in 2003.
The power plant is currently owned by Iberdrola.
C.H. Millares II is a reservoir based project. The net head of the project is 123m. The project generated 240 GWh of electricity. The project cost is $83.701m.
The project has 2 electric generators installed at the site. The generator capacity is 35.3 MVA.